Marvelane Homes by the Lake is a 23 acre luxurious mixed-residential development in Putra Heights, Subang comprising of 157 units of luxury homes.  The entire development consist of Bungalows, Semi-D, Cluster Houses, Lake villas and 2 blocks of condominiums. It is themed as a private, low-density sanctuary surrounded by the tranquility of nature.

Marvelane Homes was developed with M360 Features – focusing on Ambience, Quality, Design & Technology, Sustainability, Fair Value, Location & Accessibility and Amenities & Facilities. For security, Marvelane Homes is equipped with 3-tier gated and guarded security with perimeter fencing, CCTV surveillance and 24 hour guard patrol to give its residence the sense of security.

Marvelane Homes Project Plan

The Marvelane Homes by the Lake project is made up of 2 phases, in which Phase 1 is the development of Garden Residences which consist of 40 Semi-Detached Homes with a generous space of 40 x 80 sq ft or 40 x 90 sq ft, 4 Cluster Homes and 2 Bungalows.

Marvelane Homes Phase 1

Below are the floor plan for the Semi-Detached homes (Type SD1 and SD2).

Marvelane Homes Semi-D Layout and Floor Plan

The Cluster Homes (Type RK) are also generous and thoughtfully planned, below is the layout.

Marvelane Homes Cluster Unit Layout

And lastly, the Bungalow Houses (Type RS) which is also 3 storey and abundantly spaced out for the family.

Marvelane Homes Bungalow Layout and Floor Plan

The Phase 2 of Marvelane Homes will be of the Water Residences.  These will include 20 Water Villas, 6 Townhouses and 85 Luxury Condominium Units.

Marvelane Homes Phase 2

This development is built near the picturesque 16-acre lake which is also certified as “Class 1 Lake” – meaning that the lake is certified to have good quality water and is safe for contact with skin and clean enough to swim in. This means that residences of Marvelane Homes by the Lake would be able to enjoy lakeside activities such as watersports, boating, fishing and more!  Beautiful lakeside such as these are also common for having a viewing pavilion, jogging tracks and cycling tracks.  All these and more just wraps up a perfect lifestyle abode!

Marvelane Lake

Marvelane Homes Location

This development is located at Putra Heights, Subang which means you have access to major highway like LDP, ELITE and NKVE. It is a mere 3o minutes drive to KL City Center and 25 minutes drive to Putrajaya in normal traffic condition. Its vicinity also boast of matured townships like USJ, Sunway and Subang Jaya – where you can enjoy endless shopping, dining and entertainment options. Not forgetting, it is quite near to the newly completed Putra Heights LRT station (as pictured below), so you have additional transportation options if you decide driving is not your cup of tea.

Marvelane Homes Location
Marvelane Homes Aerial Map

View other interesting landed properties in Selangor.

About the Developer – Marvelane Sdn Bhd

Marvelane Sdn Bhd was founded in 2004 and is a property developer with a unique and holistic approach to the question of “What makes an ideal home?”.  They coined the approach called M360 which is embodied in every aspect of their development, including planning, designing and construction. Project under their belt include Marvelane Square and Marvelane Homes.



Latest Properties Worth Checking Out

Gamuda Cove is a 1,530 acres new township in Southern Klang Valley featuring a variety of homes - Palma Sands Terrace Homes, Enso Woods 2 & 3 Storey Terrace Homes, Waterfront Estates luxury homes, Maya Bay Residences, and more. Check out the below virtual showroom of one of the terrace homes type in Gamuda Cove.

 

Delta Terrace Home
28" x 65"
Built-up from 2,620 sq ft
4 Bedrooms, 4 Baths
 

Gamuda Gardens is an 810 acre new township in Sungai Buloh/Kuang/Rawang area offering a myriad of modern homes nestled in nature - Village Homes with four types of terrace homes, Agalia, Lavena, Aida and Nara, Lakeside Homes with Linked Semi-D Jovita and Superlink Joya, Illaria Hillside Homes with 2 and 3 Double Storey Homes, Gaia Residences serviced apartments, upcoming Semi-D and Bungalows.  Check out one of the virtual showroom of Illaria below:

 


Illaria Hillside Homes
Type B
Sneak Preview of soon-to-be-launched homes

 

LATEST ARTICLES